home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V16_3 / V16NO397.ZIP / V16NO397
Internet Message Format  |  1993-07-13  |  34KB

  1. Date: Thu,  1 Apr 93 05:10:44    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V16 #397
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Thu,  1 Apr 93       Volume 16 : Issue 397
  10.  
  11. Today's Topics:
  12.                     Atlas rocket question (2 msgs)
  13.          Clued-In Higgins, et al-isms (was Re: UARS status?)
  14.     First Mission of the Small Expendable Deployer System SUCCESS!
  15.                       Flame Derby quarter finals
  16.                             Guns for Space
  17.                            Jules Verne Gun
  18.                    Mars Observer Update - 03/29/93
  19.     NASA overruns (was: First Mission  of the Small Expendable...)
  20.           Programme info: Workshop on AI and KBSs for Space
  21.                       Question on Cassini Radar
  22.                        Space Research Spin Off
  23.                       Sr-71 in propoganda films?
  24.                   Status of U.S./Soviet Cooperation
  25.            the call to space (was Re: Clueless Szaboisms )
  26.                          Why is Venus so bad?
  27.                   Why use AC at 20kHz for SSF power
  28.  
  29.     Welcome to the Space Digest!!  Please send your messages to
  30.     "space@isu.isunet.edu", and (un)subscription requests of the form
  31.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  32.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  33.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  34. ----------------------------------------------------------------------
  35.  
  36. Date: 31 Mar 93 16:13:15 GMT
  37. From: Rob Unverzagt <shag@aero.org>
  38. Subject: Atlas rocket question
  39. Newsgroups: sci.space
  40.  
  41. In article <1993Mar30.210244.27187@dbased.nuo.dec.com> fisher@skylab.enet.dec.com () writes:
  42. > In article <1pa57o$4qt@access.digex.com>, prb@access.digex.com (Pat) writes:
  43. > |>
  44. > |>A question is asked about the configuration of an atlas.
  45. > |>
  46. > |>Arentt those Boost engines?  THey  help at liftoff and get dropped?
  47. > The question was about the little flames shooting out at an angle.  Those are
  48. > called "verniers" and are used to stabilize and stear.  They don't provide much
  49. > thrust as such things go.
  50. > |>I read in this weeks news, that the ATLAS-Centaur for UFO-NAVY
  51. > |>Dropped into a bad orbit due to a failure in these engines.
  52. > |>
  53. > |>They apparently burned at only 65% power, consuming fuel at too high 
  54. > |>a rate.   The centaur corrected some for the failure,  but UFO
  55. > |>is now sitting in an orbit with too low an apogee.   
  56. > |>
  57. >  
  58. > I never saw anything about what the problem was with the recent Atlas-Centaur
  59. > failure,
  60.  
  61. The rumor is that there was an "oxidizer regulator" anomaly in the
  62. sustainer engine.
  63.  
  64. >  but the Atlas is a rather odd beast in that it has a single engine in
  65. > the middle called a sustainer which starts before liftoff and runs all the way
  66. > to orbit (or till the end of Atlas-powered flight, anyway).  Then there is
  67. > an engine on either side of the sustainer which burns for only the beginning of
  68. > the flight.  Then these engines are jettisoned to save weight.  That may be
  69. > what
  70. > you are talking about.
  71. > Yes, I imagine McD-D is probably really concerned now, though the previous two
  72. > failures were in the Centaur, not the Atlas.
  73. >
  74.  
  75. I imagine that McD-D is pretty happy, given that they make the Delta
  76. and some payloads might jump ship from the Atlas (which is made by
  77. General Dynamics) to the Delta.
  78.  
  79. Shag
  80.  
  81. -- 
  82.        Rob Unverzagt        |
  83.   shag@aerospace.aero.org   |       Tuesday is soylent green day.
  84. unverzagt@courier2.aero.org | 
  85.  
  86. ------------------------------
  87.  
  88. Date: 31 Mar 93 06:35:00 GMT
  89. From: Pat <prb@access.digex.com>
  90. Subject: Atlas rocket question
  91. Newsgroups: sci.space
  92.  
  93. In article <1993Mar30.210244.27187@dbased.nuo.dec.com> fisher@skylab.enet.dec.com () writes:
  94. >
  95. >In article <1pa57o$4qt@access.digex.com>, prb@access.digex.com (Pat) writes:
  96. >
  97. >I never saw anything about what the problem was with the recent Atlas-Centaur
  98. >failure, but the Atlas is a rather odd beast in that it has a single engine in
  99. >the middle called a sustainer which starts before liftoff and runs all the way
  100. >to orbit (or till the end of Atlas-powered flight, anyway).  Then there is
  101. >an engine on either side of the sustainer which burns for only the beginning of
  102. >the flight.  Then these engines are jettisoned to save weight.  That may be
  103. >
  104.  
  105. According to the space news article,  the Atlas  has an unusual configuration.
  106.  
  107. It has a two engine three nozzle  configuration.  Now that's an odd one.
  108.  
  109. Does it use both engines in  the sustainer,  and then the boost nozzles
  110. just drop off.   If so,  are the boost nozzles just to help give mass flow?
  111.  
  112.  
  113. >Yes, I imagine McD-D is probably really concerned now, though the previous two
  114. >failures were in the Centaur, not the Atlas.
  115.  
  116. Actually,  I think GD makes the Atlas.
  117.  
  118. pat
  119.  
  120. ------------------------------
  121.  
  122. Date: Wed, 31 Mar 1993 04:40:00 GMT
  123. From: David Ward <abdkw@stdvax>
  124. Subject: Clued-In Higgins, et al-isms (was Re: UARS status?)
  125. Newsgroups: sci.space
  126.  
  127. In article <1993Mar25.132936.1@fnalf.fnal.gov>, higgins@fnalf.fnal.gov (Bill Higgins-- Beam Jockey) writes...
  128. >In article <24MAR199317112710@stdvax>, abdkw@stdvax (David Ward) writes:
  129. >> I believe so...GSFC's Director's Weekly's haven't reported any 
  130. >                 ^^^^^^ ^^^^^^^^^^ ^^^^^^^^
  131. >Is this publication available on-line?  Any chance we could arrange to have it
  132. >posted to sci.space.news?
  133. The Director's Weekly is only for internal use (too many contracturally
  134. sensitive statements like "We are internally reviewing Companies X and
  135. Y for the XYZ Program I&T contract", and the like).  I've heard the
  136. nasa.nasamail.gsfc newsgroup can be the source for some info, but I'm
  137. not sure what you're looking for.  For those who are interested in
  138. monthly progress, the Goddard News includes a one-page "What's Up"
  139. column which has _honest_ one paragraph accounts of recent spacecraft
  140. progress.  S/C include UARS, GRO (er, Compton), HST, EUVE, TDRS-6, and
  141. SAMPEX (first of the quicker, cheaper, better Small Explorers).
  142.  
  143. For info on a subscription, call Fred Brown at (301) 286-7277. I 
  144. realize its not nearly as nice as JPL's FTP site, but its a start.
  145.  
  146. BTW, Bill Higgins was the only person to show any interest in GSFC
  147. space programs.  I realize that GSFC is a low-key (read: "Who cares
  148. about Explorers and Earth-pointers?") NASA Center, but I did expect
  149. a _bit_ more interest. Is there more out there, or should Bill and
  150. I just send notes back and forth when he's got a question???
  151.  
  152.  
  153. oh yeah, wanted to add something else...
  154.  
  155. >Wait your turn, punk.  There are lots of old-timers who haven't been
  156. >honored with "Clueless Spencerisms" or "Clueless Higginsisms" yet.
  157. >Bill Higgins, Beam Jockey              | According to the doctrine
  158.  
  159. Thanks for the lesson in flame etiquette, and for fulfilling my
  160. request.  I will treat you in the future with all due respect as
  161. one of my elders.:-)
  162.  
  163. David Ward  abdkw@stdvax.gsfc.nasa.gov
  164. the Punk at NASA/GSFC
  165.  
  166. ------------------------------
  167.  
  168. Date: Wed, 31 Mar 1993 16:22:17 GMT
  169. From: "Allen W. Sherzer" <aws@iti.org>
  170. Subject: First Mission of the Small Expendable Deployer System SUCCESS!
  171. Newsgroups: sci.space
  172.  
  173. In article <1993Mar31.140338.10262@cseg04.engr.uark.edu> acw@cseg04.engr.uark.edu (Andrew C. Welch) writes:
  174.  
  175. >First of all, private companies do not have to deal with procurement
  176. >regulations which make the whole system extremely complicated and expensive.
  177.  
  178. That is true but govenrment need not either. SDIO, for example, uses
  179. different regulations and as a result pays far less for their work and
  180. brings it in on time. NASA could run its programs the way SDIO does if
  181. it wanted.
  182.  
  183. >Perhaps a solution would be for Congress to let NASA (or any other agency)
  184. >conduct business the way they choose while at the same time holding them
  185. >responible for the results.  
  186.  
  187. Gee... what a radical idea! That is how the government run DC project
  188. works.
  189.  
  190. >This system would allow NASA the freedom to
  191. >be competitive with private companies while at the same time preventing
  192. >NASA from pointing fingers at congress.
  193.  
  194. That's the rub. It is a lot safer to go with things as they are where you
  195. have a safe job and nobody cares if you do anything.
  196.  
  197.   Allen
  198.  
  199. -- 
  200. +---------------------------------------------------------------------------+
  201. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  202. |  aws@iti.org     |  nothing undone"                                       |
  203. +----------------------77 DAYS TO FIRST FLIGHT OF DCX-----------------------+
  204.  
  205. ------------------------------
  206.  
  207. Date: Wed, 31 Mar 93 18:25:38 EST
  208. From: Tom <18084TM@msu.edu>
  209. Subject: Flame Derby quarter finals
  210.  
  211. >>Bill again;
  212. >>>What do you think, George, are pat and Steinn promising new contenders
  213. >>>in the Flame Derby?
  214.  
  215. Tom sez;
  216. >>Well, Pat, yes, but I'd have to go with Fred McCall over Steinn :-)
  217. >>Sorry Steinn.
  218.  
  219. Fred Responds;
  220. >But I don't remember you being asked, Tommy (unless you changed your
  221. >name to George when nobody was looking).  Given what I've seen from
  222. >you over the years, I think you're more a candidate than a voter.
  223.  
  224. Oh my God!  I'm really sorry.  I know how frowned upon it is to offer an
  225. opinion on someone elses thread, especially one so serious as, uh, let
  226. me look here, oh yeah, "Flame Derby".  Please, Fred and everyone, accept
  227. my humble apology for being so blatantly out of line.
  228.  
  229. Happy now Fred?  I hope so, since I'd like to help you keep your contentless,
  230. personal, unfunny posts to a minimum, and apparently, I'm responsible for
  231. this one.  You got me, I overstepped bounds, but let's not rub my face in it,
  232. OK?  I've got my pride, too, so please let me off easy this time.
  233.  
  234. (The Flame Derby thread was a joke, BTW)
  235.  
  236. -Tommy Mac
  237. -------------------------------------------------------------------------
  238. Tom McWilliams | 517-355-2178 (work) \\     Inhale to the Chief!
  239. 18084tm@ibm.cl.msu.edu  | 336-9591 (hm)\\  Zonker Harris in 1996!
  240. -------------------------------------------------------------------------
  241.  
  242. ------------------------------
  243.  
  244. Date: Wed, 31 Mar 1993 15:41:14 GMT
  245. From: Dave Stephenson <stephens@geod.emr.ca>
  246. Subject: Guns for Space
  247. Newsgroups: sci.space
  248.  
  249. Sorry about Key Words!
  250. There has been a lot of work over the years on using a Gun to
  251. launch space payloads. The Harp project under G. Bull launched
  252. payloads to 130 Kms from Barbadoes using "Ole Betsy", two 16
  253. inch naval guns butted together. Accelerations up to 5000 G's
  254. are acceptable if you want to launch solid fuel rockets, after that
  255. the grains come unstuck. This was the priciple behind "Babylon" of
  256. the Iraquis. Really a static charge, plenum chamber, rocket launcher
  257. rather than a conventional gun. 
  258.     The Germans in the 2 world war used their Millipede, or Hochsdruck-
  259. pump cannon to bombard Antwerp, and the principle could be re-tried.
  260. More interesting and practicable would be the "Ram Tube" being developed
  261. by Prf. Herzberg at Washington University in Seattle, or the electromagnetic
  262. coil gun under study at Sandia Labs.. 
  263. Incidently I am told that a nuke launcher was accidently created when 
  264. a 'very heavy' metal cover on the bore tube for an underground test
  265. was blown off. Last seen going up at an estimate velocity of about
  266. twice escape!
  267. --
  268. Dave Stephenson
  269. Geodetic Survey of Canada
  270. Ottawa, Ontario, Canada
  271. Internet: stephens@geod.emr.ca
  272.  
  273. ------------------------------
  274.  
  275. Date: Wed, 31 Mar 1993 15:28:09 GMT
  276. From: James Davis Nicoll <jdnicoll@prism.ccs.uwo.ca>
  277. Subject: Jules Verne Gun
  278. Newsgroups: sci.space
  279.  
  280.     Didn't  the US already (inadvertantly) lob an object upwards
  281. at  70km/s?  Something to  do  with the cap of a underground nuclear
  282. test shaft...
  283.  
  284.                             James Nicoll
  285.  
  286. ------------------------------
  287.  
  288. Date: 31 Mar 1993 11:19:22 -0500
  289. From: Pat <prb@access.digex.com>
  290. Subject: Mars Observer Update - 03/29/93
  291. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  292.  
  293. In article <30MAR199319014478@kelvin.jpl.nasa.gov> baalke@kelvin.jpl.nasa.gov (Ron Baalke) writes:
  294. |In article <1p7fqc$nr2@access.digex.com>, prb@access.digex.com (Pat) writes...
  295. |>In article <29MAR199317304410@kelvin.jpl.nasa.gov> baalke@kelvin.jpl.nasa.gov (Ron Baalke) writes:
  296. |
  297. |>Now what SPace NEws said, is that they are concerned about instrument
  298. |>failure while waiting for the Dust to settle.   Is this true?
  299. |>Are they really concerned about instrument failure?
  300. |
  301. |There is no concern for instrument failure, the science team just wants
  302. |to get started as soon as possible.  There are two periods next year where
  303. |science data collection will be suspended or minimal: during the solar 
  304. |conjuction period in December/January, and during the Mars dust storm
  305. |season that runs roughly from February to August.
  306. |
  307.  
  308. Either I misinterpreted teh space news article (maybe it was AW&ST)
  309. or they were putting more play onto the story.  Hardly the first case
  310. of journalistic over-exageration.  
  311.  
  312. |>And if that is the case, could they have planned the mission to avoid the
  313. |>dust season?   
  314. |
  315. |Predicting dust storms on Mars isn't an exact science.  The bigger
  316. |contraint is the launch window to Mars which occurs about every two years.
  317. |
  318.  
  319. Yep,  the hohmann orbit comes in every 2 years,  but  they aren't
  320. quite in a hohmann orbit.  Something about this requiring more energy
  321. from the Launcher,  but a lower energy braking orbital burn.
  322. I wasn't sure if they could have played around with the flight
  323. parms  to  miss the dust storms  a little more.  But then Orbital mechanics is
  324. not an area of strength for me.
  325.  
  326. |>ALso,  it seems to me, that fuel is a real precious
  327. |>resource.  After the mapping is done,  reserve fuel could
  328. |>be saved for  orbit changes,  or to improve mapping of the moons phobos
  329. |>and deimos.
  330. |
  331. |There will still be enough fuel for an extended mission after the primary
  332. |mission ends in 1995.  This assumes though that the spacecraft won't be 
  333. |turned off due to lack of funding.  
  334.  
  335. Now isn't that always the kicker.  It does seem stupid to  drop
  336. a mission like Magellan, because there isn't  70 million a year
  337. to keep up the mission.  You'd think  that ongoing science  could
  338. justify the money.  JPL gets accused of spending more then neccessary,
  339. probably some validity in that,  but NASA  does put money into some
  340. things  that really are Porcine.  Oh well.
  341.  
  342. pat
  343.  
  344. ------------------------------
  345.  
  346. Date: Wed, 31 Mar 1993 16:18:28 GMT
  347. From: "Allen W. Sherzer" <aws@iti.org>
  348. Subject: NASA overruns (was: First Mission  of the Small Expendable...)
  349. Newsgroups: sci.space
  350.  
  351. In article <30MAR199317262137@judy.uh.edu> wingo%cspara.decnet@Msfc.Nas.Gov writes:
  352.  
  353. >>Sorry Dennis. For most projects NASA gets what they want but still
  354. >>generally run over and take longer. Examples:
  355.  
  356. >>1. ASRM (also known as the "Jamie Lee Whitten Memorial Pork Delivery
  357. >>   System). This project ALWAYS gets as much or more than they ask for...
  358.  
  359. >Remember that NASA did not want this and left it out of the budget and
  360. >still it was crammed down their throats by congress.  
  361.  
  362. Not true. NASA has asked for ASRM funding each and every year. It is
  363. true that last year the budget submitted by OMB didn't include ASRM
  364. but the NASA request included it and they testified before congress
  365. that they wanted it.
  366.  
  367. NASA wanted it and it wasn't crammed down their throats by Congress.
  368.  
  369. >Also I think you should look at the numbers on the budget. I don't think
  370. >they always got what they wanted.
  371.  
  372. Not only did they get what they wanted, the sometimes got more. In
  373. 1990, for example, funds where transfered from SEI to EOS and ASRM
  374. giving ASRM about 25% more than they asked for.
  375.  
  376. >>3. Advanced turbopumps. Overrun by over 500% yet they got not only all
  377. >>   the funds but even got the scope of the project reduced.
  378.  
  379. >I don't think so on this one. From what I remember, the budget has always
  380. >been underfunded from what the folks here at MSFC asked for. 
  381.  
  382. That's NASA, not Congress. Turbopumps aren't a line item. The only
  383. management by Congress as far as I know was directing NASA to halt
  384. development of the hydrogen pump (which shouldn't affect cost of the
  385. remaining work).
  386.  
  387. BTW, NASA Associate Administrator places the blame for this on NASA for
  388. underestimating requirements and costs. Can't blame Congress for this one.
  389.  
  390. >>4. A GAO study found that over half of the NASA contracts overrun by
  391. >>   a significant amount.
  392.  
  393. >I wonder how that would work out if you restricted it to non micromanaged
  394. >contracts.  
  395.  
  396. Wouldn't have much impact. Congress simply doesn't go into that much
  397. detail.
  398.  
  399. >Also it would be instructive to see how much other government
  400. >operations such as |HUD and others overrunn as a percentage of contracts.
  401.  
  402. I care about space, not HUD. Pointing to others doing an even worse job
  403. won't mean a thing.
  404.  
  405. >>5. According to the NASA cost model, the Wake Shield Facility should
  406. >>   cost $93M to build (before overruns). A private company is building
  407. >>   the exact same thing for $11M.
  408.  
  409. >All depends on how you verify the work. 
  410.  
  411. Apparently the NASA way costs several times as much as the commercial
  412. way but doesn't seem any better. Looks like a NASA problem to me.
  413.  
  414. >It is funny that I am seeing a lot
  415. >of last minute hassles by a certain NASA center on one of my payloads.  
  416. >The "commercial" procurement allowed us to drop some of the more stupid
  417. >rules on how to put together hardware. Well at the last minute Center X is
  418. >going orbital on our engineering. All of this work will not be charged 
  419. >against our "commercial" contract but against Shuttle operations. I wonder
  420. >how often this happens and how this impacts the shuttle program as a 
  421. >whole.
  422.  
  423. So your saying that NASA is making you do a bunch of pointless tests
  424. and then covering up the costs by using accounting methods which would
  425. get a contractor thrown in jail if he or she tried it.
  426.  
  427. Sounds like a NASA problem to me.
  428.  
  429. >>6. The NASA cost model says that SpaceHab should cost $1.13 billion to
  430. >>   build. A private company is building it for $153 million.
  431.  
  432. >Funny that it is this very facility that I am talking about above. 
  433.  
  434. Not the same thing Dennis. Your talking about operations and I am
  435. talking development. The fact remains that a private company spent
  436. $153 million to build what NASA would take $1.13 BILLION to build (not
  437. counting overruns and funny accounting you allude to above).
  438.  
  439. Spacehab couldn't use NASA methods to hide the costs. Their investors,
  440. auditors, and the feds wouldn't let them.
  441.  
  442. >IUt is 
  443. >funny how money and chargers can be pushed around to make one or another
  444. >organization look good or bad depending on how the political wind is blowing.
  445.  
  446. Only if your NASA. The rest of us must obey the law.
  447.  
  448. >I agree that there are times where NASA completly and totally screws up. We
  449. >all do, even Allen BUT it is also true that the likelyhood of coming in
  450. >on time and under budget is drastically reduced by the interference by
  451. >Congress.
  452.  
  453. Not always. NASA spent $5 billion and five years on a station which was,
  454. according to one Houston engineer, "...broken from the start" (see
  455. Avation week, Nov, 12, 1990 page 26). This was a station for which
  456. "proper integration of the current design has been totally lacking" (IBID).
  457.  
  458. Yet NASA wanted to spend another $35 billion on the same design. It looks
  459. to me like Congress prevented the mother of all overruns by 'micromanaging'
  460. a redesign.
  461.  
  462. >I am not saying NASA is blameless. In the commercial world, when a company 
  463. >screws up, it goes to the bottom line and in many cases the company 
  464. >ceases to exist. I have seen it happen many many times. When NASA screws up
  465. >it is blamed and all kinds of fix it ideas are offered.  
  466.  ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
  467. The problem is that the blame is usually Congress and the fix is 'lots more
  468. $$$$'.
  469.  
  470. >results. Case in point is the success of MacDac in the Delta program and
  471. >in the DC program. The same company using the same management style and
  472. >approach has screwed the C-17 so bad it may never be fixed and has...
  473.  
  474. No Dennis, the management styles are very very different. C-17 is run
  475. the way federal projects are generally run. Not so with DC.
  476.  
  477.     Allen
  478. -- 
  479. +---------------------------------------------------------------------------+
  480. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  481. |  aws@iti.org     |  nothing undone"                                       |
  482. +----------------------77 DAYS TO FIRST FLIGHT OF DCX-----------------------+
  483.  
  484. ------------------------------
  485.  
  486. Date: Wed, 31 Mar 93 15:00:57 GMT
  487. From: Joachim Fuchs <joachim@wgs.estec.esa.nl>
  488. Subject: Programme info: Workshop on AI and KBSs for Space
  489. Newsgroups: sci.space
  490.  
  491. Artificial Intelligence and Knowledge Based Systems for Space
  492.                       - 4th Workshop -
  493.  
  494.                    May 17th - 19th, 1993
  495.  
  496.                      ESTEC, Noordwijk
  497.                      The Netherlands
  498.  
  499.                        Organized by
  500.  
  501.                   THE EUROPEAN SPACE AGENCY
  502.          Simulation & Electrical Facilities Division
  503.                    Technical Directorate
  504.  
  505.  
  506. Purpose
  507. =======
  508. The European Space Agency (ESA) has for many years 
  509. pursued activities in Artificial Intelligence and Knowl-
  510. edge Based Systems for Space. The technology has 
  511. already been successfully applied in several domains and 
  512. is now widely considered a viable option in many devel-
  513. opments.
  514.  
  515. The objective of this workshop is to obtain an active 
  516. exchange of information within the European AI com-
  517. munity, within industry as well as within ESA. Not only 
  518. increasing awareness of the new developments and tech-
  519. nologies play an important role, but inputs obtained in 
  520. this workshop will also serve ESA to harmonize and 
  521. standardize the developments in Artificial Intelligence 
  522. for European Space programmes.
  523.  
  524. This programme reflects the main interests of the 
  525. Agency in this workshop. The first day will be dedicated 
  526. to the use of AI techniques in applications. The second 
  527. day is entirely dedicated to specialized sessions and 
  528. Round Table discussions, featuring some of the present 
  529. activities of ESA/ESTEC. The final day will mainly con-
  530. centrate on Methodology aspects of Artificial Intelli-
  531. gence.
  532.  
  533.  
  534. Organizing Committee
  535. ====================
  536. U. Mortensen, ESA/ESTEC (Workshop Chairman)
  537. F. Allard, ESA/ESTEC
  538. E. Bornschlegl, ESA/ESTEC
  539. F.-J. Demond, ESA/EAC
  540. H.A. Laue, ESA/ESOC
  541. A. Moya, Commission of the European Communities (DG XIII)
  542. G. Muhlhauser, ESA/ESRIN
  543. S. Valera, ESA/ESTEC
  544. J. Fuchs, ESA/ESTEC (Workshop Organizer)
  545.  
  546.  
  547. Programme
  548. =========
  549. The general schedule of the workshop is as follows:
  550.  
  551. Monday:
  552.     Registration and Welcome speech
  553.     Session I: General (Plenary)
  554.     Session II: Applications (Plenary)
  555. Monday evening:
  556.     Cocktail
  557.  
  558. The Tuesday is dedicated for Round Table Discussions. The
  559. subjects chosen are the following:
  560.     Session III: Model-Based Reasoning (Parallel)
  561.     Session IV: Knowledge Reuse (Parallel)
  562.     Session V: Planning (Parallel)
  563.  
  564. The morning sessions are intended to provide a certain background 
  565. of the subjects to be discussed in the afternoon. They serve as 
  566. well to introduce some of the participants and their particular 
  567. interests.
  568.  
  569. After the lunch break the moderators of the different parallel 
  570. sessions will introduce to the discussion groups, and - depending 
  571. on interest and breadth of the field - possibly several working 
  572. groups will be initiated in order to discuss issues raised in the 
  573. morning sessions.
  574.  
  575. At the end of the day there will be a plenary session with a short 
  576. summary of the results obtained in the discussions.
  577.  
  578. Wednesday:
  579.     Session VI: Verification and Validation (Plenary)
  580.     Session VII: Methodology (Plenary)
  581.  
  582. The total number of papers presented will be 40.
  583. There will be an area dedicated to posters and demonstrations.
  584.  
  585. General Information
  586. ===================
  587. The Workshop is free of charge. Working language will be English.
  588.  
  589. If you would like to have more detailed information, (complete 
  590. programme...) please contact either:
  591.     ESA/ESTEC
  592.     Conference Bureau
  593.     P.O. Box 299
  594.     NL-2200 AG Noordwijk
  595.     The Netherlands
  596.     Tel: +31-1719-8-5005, Fax: +31-1719-8-5658
  597. or the Organizer:
  598.     ESA/ESTEC-WGS
  599.     Joachim Fuchs
  600.     P.O.Box 299
  601.     NL-2200 AG Noordwijk
  602.     The Nethrlands
  603.     Tel: +31-1719-8-5298, Fax: +31-1719-8-5419
  604.     email: joachim@wgs.estec.esa.nl
  605.  
  606. Registration should be sent to the Conference Bureau. ESTEC has as
  607. well a Hotel Reservation service (Tel: +31-1719-8-5858).
  608. Registrations should be made by April 16th (particularly important
  609. for hotel reservations).
  610.  
  611. =========================================================================
  612. = esa/estec-WGS             c/o Joachim Fuchs                           =
  613. = Keplerlaan 1              Telephone: +31/1719-85296                   =
  614. = Postbus 299               Telefax:   +31/1719-85419                   =
  615. = NL-2200 AG Noordwijk      Email:     joachim@wgs.estec.esa.nl   or    =
  616. = The Netherlands                      jfuchs@estec.estec.esa.nl        =
  617. =========================================================================
  618.  
  619. ------------------------------
  620.  
  621. Date: 31 Mar 93 04:09:42 GMT
  622. From: Bill Higgins-- Beam Jockey <higgins@fnalf.fnal.gov>
  623. Subject: Question on Cassini Radar
  624. Newsgroups: sci.space
  625.  
  626. In article <1pb5slINNqv4@rave.larc.nasa.gov>, sdd@larc.nasa.gov (Steve Derry) writes:
  627. > David Seal (seal@leonardo.Jpl.Nasa.Gov) wrote:
  628. > : That's a neat question.  For now we are not planning to point it at anything
  629. > : except Titan.
  630. > Would the radar be of any benefit in trying to characterize Saturn's rings?
  631. > I.e. distributions of particle (or boulder?) size, etc?
  632.  
  633. If I may speculate here (David can give us the *correct* answer),
  634. radar would be useful, in principle, for looking at the rings, but
  635. Cassini will not get close enough to the rings to use it.   Recall
  636. that this is true for the surfaces of moons as well, other than Titan.
  637.  
  638. The performance of radar is limited in range and Cassini's must be
  639. rather close to its targets, within a few thousand kilometers.
  640.  
  641. -- 
  642.      O~~*           /_) ' / /   /_/ '  ,   ,  ' ,_  _           \|/
  643.    - ~ -~~~~~~~~~~~/_) / / /   / / / (_) (_) / / / _\~~~~~~~~~~~zap!
  644.  /       \                          (_) (_)                    / | \
  645.  |       |     Bill Higgins   Fermi National Accelerator Laboratory
  646.  \       /     Bitnet:     HIGGINS@FNAL.BITNET
  647.    -   -       Internet:  HIGGINS@FNAL.FNAL.GOV
  648.      ~         SPAN/Hepnet:      43011::HIGGINS 
  649.  
  650. ------------------------------
  651.  
  652. Date: Wed, 31 Mar 1993 15:34:42 GMT
  653. From: Dave Stephenson <stephens@geod.emr.CA>
  654. Subject: Space Research Spin Off
  655. Newsgroups: sci.space
  656.  
  657. For my money the most important piece of space research spin off to
  658. date (rather before the time of NASA) is Australia. NSW was colonised
  659. because of the excellent maps produced by the Endurance expedition
  660. lead by Capt. Cook. The primary mission objective of that voyage was
  661. to observe the transit of Venus from Tahiti. This in turn was only
  662. one of many observations taken around the world to estimate the 
  663. Astronomical Unit, that is the distance from the Earth to the Sun.
  664. If measuring the distance from the Earth to the Sun is not space
  665. research I do not know what is! Incidently the Endurance was a second 
  666. hand coal ship that was impounded by the Portungese in Brazil because
  667. thye could not believe that such a scruffy vessel would be used byt
  668. the Royal Navy (but it was for scientific research).
  669. --
  670. Dave Stephenson
  671. Geodetic Survey of Canada
  672. Ottawa, Ontario, Canada
  673. Internet: stephens@geod.emr.ca
  674.  
  675. ------------------------------
  676.  
  677. Date: Wed, 31 Mar 93 18:06:00 EST
  678. From: Tom <18084TM@msu.edu>
  679. Subject: Sr-71 in propoganda films?
  680.  
  681. Here's an obscure question, for anyone interested:
  682.  
  683. I recently saw "Atomic Cafe", an interesting film about the history of the
  684. atomic bomb, as told through TV, propaganda, press releases, etc.  There
  685. is a scene, maybe 3/4 of the way through the movie that has an image of
  686. a woman standing in from of some dark-colored (b/w film) fuselage, with
  687. air-force markings.
  688.  
  689. Is there anyone that has seen this movie that recognizes that scene, as
  690. well as the craft behind the woman?  It looked similar to the SR-71, but
  691. only the cockpit and part of the fuselage were visible, so I couldn't say
  692. for sure.
  693.  
  694. I'm curious because I thought the SR-71 was secret for quite a while, and
  695. I'd be surprised if it somehow got into this film by accident.
  696.  
  697. -Tommy Mac
  698. -------------------------------------------------------------------------
  699. Tom McWilliams | 517-355-2178 (work) \\     Inhale to the Chief!
  700. 18084tm@ibm.cl.msu.edu  | 336-9591 (hm)\\  Zonker Harris in 1996!
  701. -------------------------------------------------------------------------
  702.  
  703. ------------------------------
  704.  
  705. Date: 31 Mar 93 07:35:21 GMT
  706. From: Pat <prb@access.digex.com>
  707. Subject: Status of U.S./Soviet Cooperation
  708. Newsgroups: sci.space
  709.  
  710. In article <1pc75eINN7a9@phantom.gatech.edu> matthew@phantom.gatech.edu (Matthew DeLuca) writes:
  711. |The problem with the idea of Western aid saving the Russians is that any amount
  712. |that is politically viable in the West is going to be far too small to have 
  713. |any effect; remember, even with all the troubles going on over there, the
  714.  
  715. Hey, we have no trouble giving israel, 3 Billion  even 4 billion a year
  716. in direct subsidies.  We  Give japan 40-70 Billion/ year, only we call
  717. that Trade Deficit.   Who says we can't give the russians a politically
  718. viable aid package.  We just need to buy products from them.
  719. And given the current 20:1 leverage on the dollar,  it's not a problem.
  720. Even 2-4 Billion  will have spending power as 40-80 billion here.
  721. and there economy is the size of frances.  Actually if we give them too
  722. much aid, we'll super heat them  and give them inflation,  even beyond
  723. what they have.
  724.  
  725. |Russian economy is still two or three hundred billion dollars.  Two or three
  726. |billion dollars a year in aid (or commercial joint ventures) is going to be
  727. |a drop in the bucket.
  728. |
  729.  
  730. Actually most aid programs are not for then a small percentage of the GDP.
  731. The only exception is Israel, and look where it's gotten them.  
  732. My take is that a modest 5 -10 billion dollar program of combined
  733. product purchase  and direct targeted aid to key industries  mostly
  734. Oil production  and Transportation.  Will provide massive returns on
  735. investment.  If we agree to buy launch services for 2 billion/ year
  736. and just give it away to US researchers,  we'll do a lot for them.
  737.  
  738. |The only kind of aid I see having any real effect on the situation over there
  739. |is aid targeted at specific sectors of the economy that are in critically  
  740. |failing condition; food production and transportation, energy, housing, things
  741.  
  742. They produce lot's of food, it just doesn't make it to market.
  743. They also produce lot's of energy, it's just poorly utilized.
  744. Housing is not a vital problem.  People live on streets here.
  745. Food riots are the biggest concern.
  746.  
  747.  
  748.  
  749. |like that, where the money has a direct effect on the people.  Giving money 
  750. |to Energia to build Szabo Space-Toasters likely won't have that effect.
  751.  
  752. But giving money to build energiya to hurl  large structures up for
  753. lunar science  or mars exploration  would do a lot for us.
  754. Zubrins Mars DIrect proposal requires a 40 ton launch vehicle.
  755. I think energiya would nicely perform in that role.  
  756.  
  757. pat
  758.  
  759. ------------------------------
  760.  
  761. Date: 31 Mar 93 06:21:20 GMT
  762. From: Pat <prb@access.digex.com>
  763. Subject: the call to space (was Re: Clueless Szaboisms )
  764. Newsgroups: sci.space
  765.  
  766. Are canadian exports of Radio-nucliedes, also controlled by US
  767. rules.  Technology export  controls, that sort of thing?
  768.  
  769. Pat
  770.  
  771. ------------------------------
  772.  
  773. Date: 31 Mar 1993 11:43:26 -0500
  774. From: Pat <prb@access.digex.com>
  775. Subject: Why is Venus so bad?
  776. Newsgroups: sci.space,rec.scuba
  777.  
  778. In article <OIVINDT.93Mar30202040@petrus.fagmed.uit.no> oivindt@fagmed.uit.no (Oivind Toien) writes:
  779. |
  780. |In a previous record dive (dry) at NUTEC, Bergen, Norway to about 500
  781. |m they used a Heliox mixture most of the time except during the descent
  782. |were the gas mixture contained some nitrogen. The idea was the the
  783. |effect of N2 narcosis should reduce the effect of high pressure nerve
  784. |syndrome. 
  785. |Several of the divers suffered serious injury. Although technology
  786. |seems to develop infinitely, physiology sets certain limits...  
  787. |
  788. >In a program on the Norwegian channel 2 yesterday it was said that 1
  789. >of 7 divers are injured (per dive...) in dive operations in the North
  790. >Sea occuring at more than 300 m.
  791.  
  792.  
  793. My understanding is that Commercial diving  has some real problems
  794. following the Navy Dive tables.  Even if  you rigorously follow them,
  795. that multiple diving causes some form of Micro Nitrogen bubbles
  796. in the nervous tissue.  Long term studies of the spinal tissues
  797. of commercial divers shows large amounts of nerve damage.   
  798.  
  799. There is some movement to require deep diving bells, where the divers
  800. can live  underwater for extended periods and  undergo
  801. slow decompression.
  802.  
  803. pat
  804.  
  805. ------------------------------
  806.  
  807. Date: 31 Mar 1993 11:38:26 -0500
  808. From: Pat <prb@access.digex.com>
  809. Subject: Why use AC at 20kHz for SSF power
  810. Newsgroups: sci.space
  811.  
  812. In article <1993Mar30.181913.8218@mksol.dseg.ti.com> mccall@mksol.dseg.ti.com (fred j mccall 575-3539) writes:
  813. |>On 23 Mar 1993 15:25:37 -0500, Pat <prb@access.digex.com> writes:
  814. |
  815. |>/PS.  Aviation is a fairly large segment of the US economy.  Larger
  816. |>/then you think.   Dallas, Wichita, Seattle and St Louis make
  817. |>/aircraft a substantial part of their business.
  818.  
  819. |Well, I'd agree with all but that last bit.  We don't do that many
  820. |airplanes in Dallas, I don't think.  Now, if you want to go over by Ft
  821. |Worth . . .
  822. |
  823.  
  824. Well,  If one wants to get picky,  I was thinking of Arlington,
  825. that's where LTV is doing fuselage  work for god knows who all.
  826. Boeing,  McDac,  Lockheed....  I just wrapped it up under the
  827. heading Dallas, cuz I doubt few people outside of texas have ever heard
  828. of Arlington.   If i mentioned it,  most people would think of
  829. Virginia.  
  830.  
  831. WHo'se located in Fort Worth?
  832.  
  833. pat
  834.  
  835. ------------------------------
  836.  
  837. End of Space Digest Volume 16 : Issue 397
  838. ------------------------------
  839.